Self adhesive EPDM water-proof membrane is manufactured from ethylene propylene diene monomer (EPDM), including into some chemical auXiHu (West Lake) Dis.liaries, for case in point, carbon black, nanophase modifier, plasticizer, vulcanization accelerator and other folks, the surface area protected with polyethylene film, aluminum foil or good sand, the foundation covered with a EPT paper security kind of EPT fleXiHu (West Lake) Dis.ble water-resistant membrane. The item has a great EPT and bending home, it straightforward to pave. it is one particular of the most outstanding higher elastic water-proof membrane with exceptional performance elasticity.
Thickness(mm): | 2mm(1.2+.8), 3mm(1.5+1.5), three.5mm(one.5+two.) |
Allowable deviation(%): | -10 to +fifteen |
Width(mm): | 1000, 1200 |
Kind: | Vulcanized amp weldable |
Edge:
1).Self adhesive with no bonding agent and torching.
two).Good rubber elasticity and eEPTation.
3).Excellent binding EPT
4).Good seld-coalescence.
5).Safe software,no air pollution.
6).Excellent water-resistant and high energy
seven).Obtainable for soaked ground
Application:
one) Roofs, basement, toilet, bridge, underground, tunnel and dam.
2) EPT and civil constructing water-proof.
three) Geo-synthetic liner for swimming pool, channels, irrigation technique
4) EEPTly for assignments with large needs in toughness, anti-corrosion and deformation.
Development Strategy:
1). Guarantee all floor are clear,dry and dust-cost-free. Get rid of any free particles and any rust with a wire brush amp delicate broom.
two).Roll out the membrane.
3).Remove the backing paper and place the adhesive aspect to the earlier well prepared surface area.
4).To make sure a tigEPT speak to-smooth the EPT down with a dry cloth, remocing all the air bubbles
five).Push the EPT to the surface area firmly when in position.
6).Sleek flat all edages with a wallpaper roller or trowel.
seven).Following use reseal pack and keep uprigEPT in cool,dry condition.
Storage and Transportation:
1) Water-proof supplies ought to be saved unEPTdry and ventilated circumstances.
two) Distinct varieties of membranes should be piled individually.
three) UnEPTusual problem, storage period of time is 1 yr given that production date.
4) Waterproof supplies must be put vertically throughout transportation.
five) It must be retained absent from sunshine and rainwater.
6) Transport and storage method should be absent from the fire resource, storage temperature does not exceed 35 ordmC, the storage interval is one calendar year.